Faculty of polytechnics, University of Zenica , Zenica , Bosnia and Herzegovina
The paper describes analyses solution of cut in the highway. There have been used three methods of making construction: reinforced wall with HDPE geogrids, soil nailing and retaining wall 20 meters long. AASHTO standards have been used for checking stability of reinforced wall and soil nailing, while retaining wall is based on EN 1997-I standards. All of these methods are implemented in software package Plaxis which is used for exploration. The best solution is chosen by these analyses.
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
0
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.