Federalna uprava za inspekcijske poslove , Sarajevo , Bosnia and Herzegovina
This paper presents the results of physical - chemical wastewater parameters monitoring. In addition to these parameters, the flow of wastewater coming to the device was monitored. The obtained results were analyzed by comparing the minimum, maximum and mean values at the input and output on a quarterly and annual basis. All changes observed through sampling of technological wastewater in the sense that the fluent does not provide the required quality must be taken into account and changes made to the technical solutions in the project documentation and treatment system. The values of the load with the dispersed substance and the load with the organic substance were calculated, which confirmed that both the flow and the
concentration were important for the load of the device.
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.